LB3000 Asphalt Mixing Plant (200-260t/h Heavy-Duty Modular Asphalt Batching Plant)

LB3000 heavy-duty batch plant, 200-260 t/h, baghouse and automatic batching. Bid-set drawings and ISO 9001 papers from the Dezhou works.

US$320,000 – US$520,000FOB Qingdao

LIJIU · Factory direct · Asphalt plant equipment

LB Series Asphalt Mixing Plant
  • Model LB3000 asphalt mixing plant
  • Type Stationary batch type asphalt mixing plant
  • Batch capacity 3000 kg per batch
  • Practical output 200-260 t/h
  • Total installed power 645 kW
  • Cold aggregate bin quantity 6 pcs

Factory desk: +86 136 3947 0101

LB3000 Asphalt Mixing Plant (200-260t/h Heavy-Duty Modular Asphalt Batching Plant) — overview

Overview

Overview of LB3000 asphalt mixing plant

The LB3000 asphalt mixing plant is stationary batch-type hot mix asphalt production equipment with modular split design. Its batch capacity is 3000 kg per batch, with stable practical output of 240–280 tons per hour under standard working conditions.

This unit balances high production capacity and investment cost. The split modules of this plant simplify container packing and overseas site assembly work.

This model targets medium-to-large infrastructure projects, including provincial highways, urban main road reconstruction, medium airport pavement and large road maintenance projects that demand reliable batch asphalt supply.

Full configuration list

Serial numbersystemKit nameSpecification/powerQuantityRemarks
1parameterYield200-260 t/h
Stirring capacity3000kg/batch*time
Installed capacity680kw
2Cold feed systemCold hopper15m³5
Geared motor for batching conveyor beltBWD2-17-3KW5
Batching conveyor belt600mm skirt belt5
Aggregate conveyor belt reduction motorBWD4-17-7.5KW1
Aggregate conveyor belt650mm1
3Drying systemDrying drum2500mm*10000mm*18mm
Geared motorBWD5-29-22KW4
burnerFuel oil ZZR-3000
Burning coal (Nanyang Lu Cheng)
4Dust removal systemdust collectorHigh voltage pulse896
Induced draft fan160kw1
5Powder systemPowder tank (upper and lower tank)50m³2
Screw conveyor geared motorBLD3-17-5.5KW1Fresh powder can
BLD2-17-5.5KW4Old powder can
Powder elevatorBWD4-17-11KW
6Hot aggregate elevatorHot aggregate elevatorVertical plate chain bucket
Geared motorBWD7-23-6P-30KW1
7Vibrating screenVibration motor7KW2Ori Wolong
Screen
*Screen specifications3*3;10*10;15*15;22*22;35*35Specifications can be adjusted according to requirements
8Hot aggregate bin systemQuarantine40m³5
9Metering systemAsphalt weighingMeasuring bucket 300kg1
Aggregate weighingMeasuring bucket 3000kg1
Powder weighing450kg weighing bucket1
10Mixing systemGeared motorBWD7-23-6P-45KW2
Stirring capacity3000kg/batch*time
11Pneumatic systemAir compressorScrew type
12Finished productsiloCustomer choose100T
13Fuel asphalt heating system*Asphalt tank50T/Heat conduction oil type3User options
*Heavy oil tank50T/Heat conduction oil type1
Fuel heat conduction oil furnace800,000 kcal

Product images

References on the LB3000 asphalt mixing plant

Independent background on the practices described on this page is available from the Federal Highway Administration asphalt pavement recycling programme and from the Asphalt Institute. Both are non-commercial industry references and neither is affiliated with LIJIU.

Related equipment and guides

Standards and references

Specifications on this page follow European Asphalt Pavement Association — Industry standards. Ask us for the full test report when you request a quote.

Applications

Applications

New asphalt mixing plants, plant upgrades, bagged-bitumen melting on remote sites, emulsion or PMB terminals, and foam retrofit on existing batch plants.

Large-scale new highway construction projects

Highway reconstruction and expansion engineering

Urban ring road & large traffic hub road projects

National-level overseas road EPC contracting projects

Airport apron and port pavement construction

Regional centralized asphalt mixing supply center

Large municipal key road construction

Projects requiring long-time continuous asphalt mixture supply

Warm-mix asphalt and high-proportion RAP recycled asphalt projects

Why contractors specify this line

Advantages

- 3000kg batch capacity, 200-260 t/h output for medium-large road projects

- Optimized drying drum flights reduce fuel consumption by 5~8%

- High precision weighing system ensures stable asphalt mixture quality

- Modular split design for easy container export and fast field assembly

- Dual automatic/manual control mode for convenient operation & maintenance

Specifications

Specifications

Values below come from the product record. Freeze them on the approval drawing before you put them in a bid.

ItemValue
Model LB3000 asphalt mixing plant
Type Stationary batch type asphalt mixing plant
Batch capacity 3000 kg per batch
Practical output 200-260 t/h
Total installed power 645 kW
Cold aggregate bin quantity 6 pcs
Hot aggregate bin quantity 6 compartments
Dust collector type Pulse bag-house dust collector
Supported fuel Diesel / Heavy oil / Natural gas
Weighing accuracy Aggregate ±0.5%, Filler ±0.25%, Bitumen ±0.25%
Optional finished silo 80 t / 120 t
Control system PLC automatic & manual dual mode
Transportation Modular split for container shipment
Foundation requirement Reinforced concrete foundation

Installation and commissioning

Process

  1. 01

    Interface check

    Foundations, power, fuel, existing tower piping and target tph.

  2. 02

    Set-down

    Unpack, align, pipe, cable, insulate and check safety valves.

  3. 03

    Cold and hot commissioning

    Interlocks, temperature curves, foam or mill stability, weigh accuracy.

  4. 04

    Handover

    Trial-production log, operator training, maintenance interval and wear-parts list.

LB3000 Asphalt Mixing Plant (200-260t/h Heavy-Duty Modular Asphalt Batching Plant) FAQ

What is the rated output of LB3000 asphalt mixing plant?

The theoretical rated capacity is 240t/h, practical stable working capacity ranges 160-220t/h, affected by aggregate moisture and RAP proportion.

Why actual throughput of LB3000 is lower than rated value?

High aggregate moisture, poor burner combustion, screen blockage or excessive RAP addition will reduce real-world output, optimize raw material and maintain burner for better performance.

LB3000 has severe overflow and waiting-for-material phenomenon?

Check screen mesh damage or blockage, calibrate cold-feed belt speed, adjust hot-bin material level to match mix gradation.

Oil-stone ratio deviates beyond allowable range on LB3000?

Recalibrate asphalt & aggregate weighing system, inspect asphalt pump wear, keep asphalt pipeline well-insulated to stabilize bitumen viscosity.

Aggregate temperature fluctuates greatly during LB3000 production?

Adjust burner air-fuel ratio, check dryer drum condition, control cold-bin feeding uniformity, inspect baghouse differential pressure.

Can LB3000 support foamed asphalt & RAP recycled material?

Yes, it can be retrofitted with AF-BOX foaming system and RAP module, RAP adding ratio normally 15-30%, will lower total output slightly.

Bag filter bags get condensed and blocked on LB3000?

Follow correct pre-heating & shutdown procedure; avoid abrupt cooling of high-temperature flue-gas to prevent condensation damage to filter bags.

What power consumption for full-set LB3000 asphalt plant?

Total installed power approx 580-650kW, actual running power changes with hourly output and auxiliary equipment status.

Does LB3000 need heavy reinforced concrete foundation?

Main tower needs reinforced concrete foundation; auxiliary areas require compacted hard ground, follow official foundation drawing strictly.

Can LB3000 work under low-temperature winter conditions?

It can run below 5℃, enhance thermal insulation for dryer, asphalt pipes and hot bins; adjust burner parameters for cold-climate working.

Mixing mixture segregation & uneven mixing for LB3000?

Check wear of mixing blades and liners; adjust dry-mix & wet-mix time; re-calibrate weighing system and control aggregate gradation stability.

How long does LB3000 installation & commissioning take?

For experienced team, mechanical installation takes 14-21 days, plus 3-5 days for commissioning and operator training.

Need an FOB configuration for this model?

Send tph or tonnage, RAP ratio, voltage, fuel and destination port. LIJIU replies within 24 hours with scope, lead time and a spare-parts list. Desk: +86 136 3947 0101

Get a Quote WhatsApp

Related models

Related

Back to list

Related guides

Guides

WhatsApp E-mail Get a Quote