Product series
Asphalt Mixing Plants
Stationary plants suit long-term bases and high-capacity projects; mobile plants suit maintenance, short jobs and fast site changes. Both are available with OEM/ODM options for voltage, fuel and emission standards.
Asphalt Mixing Plants
Asphalt Mixing Plants
Stationary plants suit long-term bases and high-capacity projects; mobile plants suit maintenance, short jobs and fast site changes. Both are available with OEM/ODM options for voltage, fuel and emission standards.
LB1000 Asphalt Mixing Plant (60-80t/h Modular Asphalt Batching Plant)
LB1000 modular batch plant, …
View specs
LB1500 Asphalt Mixing Plant (100-140t/h Modular Asphalt Batching Plant)
LB1500 modular batch plant, …
View specs
LB2000 Asphalt Mixing Plant (120-160t/h Heavy-Duty Modular Asphalt Batching Plant)
LB2000 modular batch plant, …
View specs
LB3000 Asphalt Mixing Plant (200-260t/h Heavy-Duty Modular Asphalt Batching Plant)
LB3000 heavy-duty batch plan…
View specs
LB4000 Asphalt Mixing Plant (280-340t/h Energy-Saving Modular Asphalt Batching Plant)
LB4000 batch plant, 280-340 …
View specs
RLB1000 Asphalt Hot Recycling Plant (80t/h Drum Type Asphalt RAP Mixing Equipment)
RLB1000 elevated drum RAP pl…
View specs
GLB60 Asphalt Mixing Plant (50-80t/h Modular Continuous Asphalt Mixing Plant)
GLB60 continuous plant, 50-8…
View specs
GLB30 Asphalt Mixing Plant (30t/h Mobile Modular Continuous Asphalt Plant)
GLB30 continuous plant, 30 t…
View specsHow to size a mixing plant
Stationary or mobile?
Stationary batch towers suit long-run bases and high tph. Mobile plants suit provincial packages, maintenance and sites that will relocate.
What decides the tph?
Hourly mix demand, RAP ratio, baghouse duty and whether the site stays put. Freeze tph on the approval drawing before fabrication.
What voltage and fuel should the RFQ state?
380–415 V / 50 Hz unless the site is different. Name burner fuel (diesel, heavy oil or gas) with the destination port.
Do you install and ship spares?
FOB Qingdao. ISO 9001 with the bid set. Installation supervision and a first-year wear-parts list are quoted with the plant.