Asphalt Equipment
LB3000 Asphalt Mixing Plant (200-260t/h Heavy-Duty Modular Asphalt Batching Plant)
LB3000 heavy-duty batch plant, 200-260 t/h, baghouse and automatic batching. Bid-set drawings and ISO 9001 papers from the Dezhou works.
US$320,000 – US$520,000FOB Qingdao
LIJIU · Factory direct · Asphalt plant equipment
LB Series Asphalt Mixing Plant- Model LB3000 asphalt mixing plant
- Type Stationary batch type asphalt mixing plant
- Batch capacity 3000 kg per batch
- Practical output 200-260 t/h
- Total installed power 645 kW
- Cold aggregate bin quantity 6 pcs
Factory desk: +86 136 3947 0101
LB3000 Asphalt Mixing Plant (200-260t/h Heavy-Duty Modular Asphalt Batching Plant) — overview
Overview
Overview of LB3000 asphalt mixing plant
The LB3000 asphalt mixing plant is stationary batch-type hot mix asphalt production equipment with modular split design. Its batch capacity is 3000 kg per batch, with stable practical output of 240–280 tons per hour under standard working conditions.
This unit balances high production capacity and investment cost. The split modules of this plant simplify container packing and overseas site assembly work.
This model targets medium-to-large infrastructure projects, including provincial highways, urban main road reconstruction, medium airport pavement and large road maintenance projects that demand reliable batch asphalt supply.
Full configuration list
| Serial number | system | Kit name | Specification/power | Quantity | Remarks |
|---|---|---|---|---|---|
| 1 | parameter | Yield | 200-260 t/h | ||
| Stirring capacity | 3000kg/batch*time | ||||
| Installed capacity | 680kw | ||||
| 2 | Cold feed system | Cold hopper | 15m³ | 5 | |
| Geared motor for batching conveyor belt | BWD2-17-3KW | 5 | |||
| Batching conveyor belt | 600mm skirt belt | 5 | |||
| Aggregate conveyor belt reduction motor | BWD4-17-7.5KW | 1 | |||
| Aggregate conveyor belt | 650mm | 1 | |||
| 3 | Drying system | Drying drum | 2500mm*10000mm*18mm | ||
| Geared motor | BWD5-29-22KW | 4 | |||
| burner | Fuel oil ZZR-3000 | ||||
| Burning coal (Nanyang Lu Cheng) | |||||
| 4 | Dust removal system | dust collector | High voltage pulse | 896 | |
| Induced draft fan | 160kw | 1 | |||
| 5 | Powder system | Powder tank (upper and lower tank) | 50m³ | 2 | |
| Screw conveyor geared motor | BLD3-17-5.5KW | 1 | Fresh powder can | ||
| BLD2-17-5.5KW | 4 | Old powder can | |||
| Powder elevator | BWD4-17-11KW | ||||
| 6 | Hot aggregate elevator | Hot aggregate elevator | Vertical plate chain bucket | ||
| Geared motor | BWD7-23-6P-30KW | 1 | |||
| 7 | Vibrating screen | Vibration motor | 7KW | 2 | Ori Wolong |
| Screen | |||||
| *Screen specifications | 3*3;10*10;15*15;22*22;35*35 | Specifications can be adjusted according to requirements | |||
| 8 | Hot aggregate bin system | Quarantine | 40m³ | 5 | |
| 9 | Metering system | Asphalt weighing | Measuring bucket 300kg | 1 | |
| Aggregate weighing | Measuring bucket 3000kg | 1 | |||
| Powder weighing | 450kg weighing bucket | 1 | |||
| 10 | Mixing system | Geared motor | BWD7-23-6P-45KW | 2 | |
| Stirring capacity | 3000kg/batch*time | ||||
| 11 | Pneumatic system | Air compressor | Screw type | ||
| 12 | Finished productsilo | Customer choose | 100T | ||
| 13 | Fuel asphalt heating system | *Asphalt tank | 50T/Heat conduction oil type | 3 | User options |
| *Heavy oil tank | 50T/Heat conduction oil type | 1 | |||
| Fuel heat conduction oil furnace | 800,000 kcal |
Product images






References on the LB3000 asphalt mixing plant
Independent background on the practices described on this page is available from the Federal Highway Administration asphalt pavement recycling programme and from the Asphalt Institute. Both are non-commercial industry references and neither is affiliated with LIJIU.
Related equipment and guides
Standards and references
Specifications on this page follow European Asphalt Pavement Association — Industry standards. Ask us for the full test report when you request a quote.
Applications
Applications
New asphalt mixing plants, plant upgrades, bagged-bitumen melting on remote sites, emulsion or PMB terminals, and foam retrofit on existing batch plants.
Large-scale new highway construction projects
Highway reconstruction and expansion engineering
Urban ring road & large traffic hub road projects
National-level overseas road EPC contracting projects
Airport apron and port pavement construction
Regional centralized asphalt mixing supply center
Large municipal key road construction
Projects requiring long-time continuous asphalt mixture supply
Warm-mix asphalt and high-proportion RAP recycled asphalt projects
Why contractors specify this line
Advantages
- 3000kg batch capacity, 200-260 t/h output for medium-large road projects
- Optimized drying drum flights reduce fuel consumption by 5~8%
- High precision weighing system ensures stable asphalt mixture quality
- Modular split design for easy container export and fast field assembly
- Dual automatic/manual control mode for convenient operation & maintenance
Specifications
Specifications
Values below come from the product record. Freeze them on the approval drawing before you put them in a bid.
| Item | Value |
|---|---|
| Model | LB3000 asphalt mixing plant |
| Type | Stationary batch type asphalt mixing plant |
| Batch capacity | 3000 kg per batch |
| Practical output | 200-260 t/h |
| Total installed power | 645 kW |
| Cold aggregate bin quantity | 6 pcs |
| Hot aggregate bin quantity | 6 compartments |
| Dust collector type | Pulse bag-house dust collector |
| Supported fuel | Diesel / Heavy oil / Natural gas |
| Weighing accuracy | Aggregate ±0.5%, Filler ±0.25%, Bitumen ±0.25% |
| Optional finished silo | 80 t / 120 t |
| Control system | PLC automatic & manual dual mode |
| Transportation | Modular split for container shipment |
| Foundation requirement | Reinforced concrete foundation |
Installation and commissioning
Process
-
01
Interface check
Foundations, power, fuel, existing tower piping and target tph.
-
02
Set-down
Unpack, align, pipe, cable, insulate and check safety valves.
-
03
Cold and hot commissioning
Interlocks, temperature curves, foam or mill stability, weigh accuracy.
-
04
Handover
Trial-production log, operator training, maintenance interval and wear-parts list.
LB3000 Asphalt Mixing Plant (200-260t/h Heavy-Duty Modular Asphalt Batching Plant) FAQ
What is the rated output of LB3000 asphalt mixing plant?
The theoretical rated capacity is 240t/h, practical stable working capacity ranges 160-220t/h, affected by aggregate moisture and RAP proportion.
Why actual throughput of LB3000 is lower than rated value?
High aggregate moisture, poor burner combustion, screen blockage or excessive RAP addition will reduce real-world output, optimize raw material and maintain burner for better performance.
LB3000 has severe overflow and waiting-for-material phenomenon?
Check screen mesh damage or blockage, calibrate cold-feed belt speed, adjust hot-bin material level to match mix gradation.
Oil-stone ratio deviates beyond allowable range on LB3000?
Recalibrate asphalt & aggregate weighing system, inspect asphalt pump wear, keep asphalt pipeline well-insulated to stabilize bitumen viscosity.
Aggregate temperature fluctuates greatly during LB3000 production?
Adjust burner air-fuel ratio, check dryer drum condition, control cold-bin feeding uniformity, inspect baghouse differential pressure.
Can LB3000 support foamed asphalt & RAP recycled material?
Yes, it can be retrofitted with AF-BOX foaming system and RAP module, RAP adding ratio normally 15-30%, will lower total output slightly.
Bag filter bags get condensed and blocked on LB3000?
Follow correct pre-heating & shutdown procedure; avoid abrupt cooling of high-temperature flue-gas to prevent condensation damage to filter bags.
What power consumption for full-set LB3000 asphalt plant?
Total installed power approx 580-650kW, actual running power changes with hourly output and auxiliary equipment status.
Does LB3000 need heavy reinforced concrete foundation?
Main tower needs reinforced concrete foundation; auxiliary areas require compacted hard ground, follow official foundation drawing strictly.
Can LB3000 work under low-temperature winter conditions?
It can run below 5℃, enhance thermal insulation for dryer, asphalt pipes and hot bins; adjust burner parameters for cold-climate working.
Mixing mixture segregation & uneven mixing for LB3000?
Check wear of mixing blades and liners; adjust dry-mix & wet-mix time; re-calibrate weighing system and control aggregate gradation stability.
How long does LB3000 installation & commissioning take?
For experienced team, mechanical installation takes 14-21 days, plus 3-5 days for commissioning and operator training.
Need an FOB configuration for this model?
Send tph or tonnage, RAP ratio, voltage, fuel and destination port. LIJIU replies within 24 hours with scope, lead time and a spare-parts list. Desk: +86 136 3947 0101
Related models
Related
RLB1000 Asphalt Hot Recycling Plant (80t/h Drum Type Asphalt RAP Mixing Equipment)
View specs
GLB60 Asphalt Mixing Plant (50-80t/h Modular Continuous Asphalt Mixing Plant)
View specs
GLB30 Asphalt Mixing Plant (30t/h Mobile Modular Continuous Asphalt Plant)
View specsRelated guides
Guides